Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Second Dredge Joins to Speed up Carolina Beach Nourishment Project (USA)
News

April 29, 2010 · about 16 years ago

Second Dredge Joins to Speed up Carolina Beach Nourishment Project (USA)

A second dredge has joined the efforts to pump the region’s beaches full of fresh sand before the start of tourism season.Dredges from Great Lakes Dredge & Dock are now pumping sand onto Carolina Beach and, as of Tuesday, Ocean Isle Beach in Brunswick County. But that wasn’t in the original plan. Wo

1 minutes read
  • LinkedIn
  • X
  • Email

A second dredge has joined the efforts to pump the region’s beaches full of fresh sand before the start of tourism season.Dredges from Great Lakes Dredge & Dock are now pumping sand onto Carolina Beach and, as of Tuesday, Ocean Isle Beach in Brunswick County. But that wasn’t in the original plan. Work on nourishing the two beach towns along with Masonboro Island and Wrightsville and Kure beaches in New Hanover County, was supposed to wrap up – and be done by the same dredge – by the end of this month…

[mappress]

Source:starnewsonline,April 30,2010;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago