USACE awarded recovery project of Los Angeles estuary dredging at Long Beach to Dutra Dredging company.
Contract award date is June 30, 2010, value of contract is $1,289,127.00.
Modification is issued to provide all labor, equipment and materials to dredge/dispose an estimated quantity of 60,815 cubic meters from LA River Estuary (Area 4), with disposal at Port of Long Beach Slip 1. In addition, a pre-construction survey of the project area for Caulerpa Taxifolia (Caulerpa) shall be conducted.
[mappress]
Source: fbo.gov, July 4 , 2010