USACE announces invitation for bids, for maintenance dredging of San Diego Harbor and Ballast Point.
Project consists of dredging the approach channel of San Diego Harbor to a depth of -55 ft. MMLW, approximately 100,000 cubic yards. Option item to dredge approximately 27,000 cubic yards from the Ballast Point Coast Guard Station, design dept of -30 ft. All dredge material will be placed in the nearshore at Imperial Beach. The estimated cost range of work is from $1,000,000 to $5,000,000.
Contracting activity is USACE District, Los Angeles department.
[mappress]
Source: fbo.gov, July 5, 2010