Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›USACE Proposes Tampa Harbor Maintenance Dredging (USA)
Project & Tenders

July 11, 2010 · about 16 years ago

USACE Proposes Tampa Harbor Maintenance Dredging (USA)

USACE announces tender for Tampa Harbor maintenance dredging. The project work consists of dredging shoal material from Cuts A, F, & G of Tampa Harbor. The Base consists of dredging 23,000 CY of material from Cut A and placement onto Egmont Key below Mean Low Water (MLW) between monuments 7 and 10.

1 minutes read
  • LinkedIn
  • X
  • Email

USACE announces tender for Tampa Harbor maintenance dredging. The project work consists of dredging shoal material from Cuts A, F, & G of Tampa Harbor.

The Base consists of dredging 23,000 CY of material from Cut A and placement onto Egmont Key below Mean Low Water (MLW) between monuments 7 and 10.

The placement area at Egmont Key is approximately 9.9 nautical miles from Cut A. The depths for Cut A are 43 ft required and 2 ft allowable overdepth. Option A is to repair the erosion on the inside of the dike near the Weir Structures and close off the Weirs to eliminate any discharge from the site.

Option B consists of dredging 62,000 CY of material from Cut F with placement in 3D disposal site located approximately 8.1 nautical miles from the dredging site. The dredging depths for Cut F are 43 ft required and 2 ft allowable overdepth.

Option C is to dredge 151,000 CY of material from Cut G with placement in 3D disposal site located approximately 7.5 nautical miles from the dredging site. The dredging depths for G are 34 ft required and 2 ft allowable overdepth.

Magnitude of construction is between $5,000,000.00 and $10,000,000.00. This solicitation will be issued on or about 24 July 2009 with the bid opening on or about 23 August 2010.

[mappress]

Source: fbo.gov, July 12, 2010

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Project & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

USACE to award FY26-29 Grays Harbor dredging contract
Dredging

USACE to award FY26-29 Grays Harbor dredging contract

about 9 months ago

Tender released for New Pass (FL) maintenance dredging
Authorities & Government

Tender released for New Pass (FL) maintenance dredging

about 11 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

USACE to award FY26-29 Grays Harbor dredging contract
Dredging

USACE to award FY26-29 Grays Harbor dredging contract

about 9 months ago
Tender released for New Pass (FL) maintenance dredging
Authorities & Government

Tender released for New Pass (FL) maintenance dredging

about 11 months ago