Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USA: Great Lakes Dredge & Dock Wins Port Manatee Berth 12 Dredging Bid
News

July 27, 2010 · about 16 years ago

USA: Great Lakes Dredge & Dock Wins Port Manatee Berth 12 Dredging Bid

The Manatee County Port Authority announced today that Great Lakes Dredge & Dock Co. has been awarded the contract for Port Manatee’s Berth 12 dredging project. The project, which includes dredging the berth to a depth of 41 feet at mean-low-water and extending it from 1,000 feet to nearly 1,600 fee

1 minutes read
  • LinkedIn
  • X
  • Email

The Manatee County Port Authority announced today that Great Lakes Dredge & Dock Co. has been awarded the contract for Port Manatee’s Berth 12 dredging project.

The project, which includes dredging the berth to a depth of 41 feet at mean-low-water and extending it from 1,000 feet to nearly 1,600 feet, is the final piece of Port Manatee’s 11-year, $200 million port expansion project.

Great Lakes’ $14.8 million bid was accepted just two months after initial bids were rejected by the port authority for exceeding the engineer’s estimate for the cost of the project. The re-bid process resulted in a $2.3 million savings for the port – 14 percent less than the original bid. The winning proposal includes the base bid and bid alternate, representing 1.1 million cubic yards of excavation and removal by hydraulic dredge to a certified uplands spoil disposal site.

“Port staff’s many years in dealing with dredging issues made us confident that a more favorable outcome was probable by re-bidding the project,” said David L. McDonald PPM®, Port Manatee’s executive director. “The savings provided by the lower bid creates a more certain timeline for the project’s completion.”

Port Manatee’s new Berth 12 is expected to accommodate containerized shipping and be operational by early-2011. The berth sits adjacent to the port’s planned 52-acre container terminal – designed to attract new containerized shipping traffic.

( businesswire )

[mappress]

Source: businesswire, July 28, 2010;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago