Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USA: $40 Million Channel Deepening Project Digs In
News

July 28, 2010 · about 16 years ago

USA: $40 Million Channel Deepening Project Digs In

The Valhalla’s huge “clamshell” scoops into the channel bottom, hauls up a dripping load of sediment, swings it over the water’s surface to a receiving scow and drops it in. Twenty-four hours a day, seven days a week, the Manson Co. vessel is hard at work dredging the Port of Long Beach’s main chann

2 minutes read
  • LinkedIn
  • X
  • Email

The Valhalla’s huge “clamshell” scoops into the channel bottom, hauls up a dripping load of sediment, swings it over the water’s surface to a receiving scow and drops it in.

Twenty-four hours a day, seven days a week, the Manson Co. vessel is hard at work dredging the Port of Long Beach’s main channel and turning basin area. The deepening of the harbor is an important part of a $40 million dredging project in and around the Port of Long Beach.

The U.S. Army Corps of Engineers and the Port have teamed up to plan and execute the project, which will improve navigation in the harbor and generate about 180 jobs a year during its two-year duration. The project has local and regional impacts, said Port Executive Director Richard D. Steinke. “By working together with the Army Corps, we are improving our facilities, which will in turn strengthen our ability to compete for business and create even more jobs in Southern California.”

In addition to Main Channel work that will provide safer navigation for cargo ships and oil tankers, the project includes the dredging of the Catalina ferry landing for the City of Long Beach and the cleanup of legacy contamination in sediments in the Terminal Island West Basin, which was once the site of a U.S. Navy facility.

The dredged-up sediment from all points is being reused within the Port. It will help fill in a slip at Pier G to create additional land as part of a terminal modernization project there.

The dredging is being funded by the Port and the federal government, which provided $4.8 million.

( polb )

[mappress]

Source: polb, July 29, 2010

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago