Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›South Africa: Expansion of Cape Town Container Terminal on Track
News

September 28, 2010 · about 16 years ago

South Africa: Expansion of Cape Town Container Terminal on Track

Transnet Port Terminal’s (TPT) investment of ZAR5.4 billion (US$760 million) over a five period to modernise Cape Town container terminal (CTCT) is on track for completion of major dredging and refurbishment of the second of four berths by May next year. The aim is to double its capacity by 2012 to

2 minutes read
  • LinkedIn
  • X
  • Email

Transnet Port Terminal’s (TPT) investment of ZAR5.4 billion (US$760 million) over a five period to modernise Cape Town container terminal (CTCT) is on track for completion of major dredging and refurbishment of the second of four berths by May next year.

The aim is to double its capacity by 2012 to 1.4 million TEU by upgrading all four berths and the Ben Schoeman Basin to allow for larger vessels. So far Berth 601 has been refurbished to allow for 420 metres of berth space to allow for one large 305-metre vessel alongside, and will be fitted out with six ship-to-shore Liebherr cranes.

The facility will also be phasing out its old straddle carriers to be replaced with 20 rubber-tyre gantry cranes to maximise space by stacking six rows wide, five containers high and 30 deep.

“There have been some challenges. Most significant of these is the complexity of maintaining uninterrupted operations at the container terminal while it is effectively a construction site,” said TPT Western Province Terminal executive, Velile Dube in a Cape Town-based iAfrica.com but added, it is well under way to transforming the CTCT into a modern four-berth facility.

It boasts access to 864 reefer plug points in reefer block 1 with an overall expansion programme of three reefer stacks with a total of 2712 reefer points served by gantry cranes.

The surge in handling equipment of new cranes has required a push on training with 33 personnel trained as operators of lifting equipment (OLEs) it now has 120 newly trained OLEs with more in the pipeline for ship-to-shore cranes next January.

[mappress]

Source: shippinggazzete, September 29, 2010;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago