Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Australia: Two Dredges Making Good Progress
News

October 11, 2010 · about 16 years ago

Australia: Two Dredges Making Good Progress

Good progress is being made by the two dredges being used for Phase 2 of the dredging and, at this stage, this phase of the dredging should be completed well before the contracted completion date of 19 November. Specialist dredging company Boskalis Australia Pty Ltd is using two of its most sophisti

2 minutes read
  • LinkedIn
  • X
  • Email

Good progress is being made by the two dredges being used for Phase 2 of the dredging and, at this stage, this phase of the dredging should be completed well before the contracted completion date of 19 November.

Specialist dredging company Boskalis Australia Pty Ltd is using two of its most sophisticated dredges to ensure the dredging can be undertaken efficiently while the port continues to operate.

The entrance to Rous Head Harbour has been successfully dredged without interference to Rottnest ferries. Most of the Entrance Channel dredging has been completed. Crushing activities by Phoenix are well ahead of schedule and the only remaining areas to be crushed are off C and D Berths.

The Gateway is focussing its efforts on removing crushed rock where access is possible, otherwise it is being utilised to remove remaining high spots in the harbour and Deepwater Channel.

Ongoing inspections of coastal and river beaches indicate that the coastal beaches are largely unaffected by the dredge plume. There was increased cloudiness in the river up to about Bicton Baths on Friday 8 October due to Gateway working at the eastern end of the harbour. This cloudiness might continue as the removal of this material is completed.

Signs have been posted at nearby river beaches advising swimmers to take care when entering the water due to the potential for reduced visibility at times.

Ongoing monitoring throughout the dredging program has confirmed that there are no ecosystem or public health threats.

Monitoring results are posted weekly on the Fremantle Ports website and include results from mussel sampling for both sentinel mussels (ie. clean mussels placed in the water for a period of six weeks) and wild mussels.

Results showed that concentrations of contaminants in both sentinel and natural mussels were below laboratory detection limits in the majority of cases and where detected did not exceed trigger levels relevant to the protection of fishing and aquaculture values.

[mappress]

Source: fremantleports, October 11, 2010

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago