Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USA: Army Corps Contractor to Complete Long Island Intracoastal Waterway Dredging Near Moriches Bay Reach
News

October 20, 2010 · about 16 years ago

USA: Army Corps Contractor to Complete Long Island Intracoastal Waterway Dredging Near Moriches Bay Reach

U.S. Army Corps of Engineers, New York District, contractor began the second phase of maintenance dredging in the Moriches Bay reach of the Long Island Intracoastal Waterway federal channel this week. Paul Howard Construction, of Greensboro, N.C., was awarded a $1.45 million contract to perform main

2 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers, New York District, contractor began the second phase of maintenance dredging in the Moriches Bay reach of the Long Island Intracoastal Waterway federal channel this week. Paul Howard Construction, of Greensboro, N.C., was awarded a $1.45 million contract to perform maintenance dredging in the Moriches Bay area of the channel to its authorized depth of 6 feet.

To accommodate sensitive marine resources, this project was split into two phases with two separate mobilizations. Phase one, which focused on areas in the Moriches Bay section with the most severe shoaling, was completed earlier this year in the late spring. Phase two, the final phase, will be completed this in the early part of the fall while dredging is environmentally feasible.

“We’re excited to complete dredging in the Moriches Bay Reach taking into account both immediate public safety needs, by first dredging the worst problem areas in the spring, and the area’s environmental needs, by breaking the work into two phases to accommodate winter flounder and other local marine life in the bay’s ecosystem,” said New York District Commander Col. John R. Boulé. “And ultimately, this work will help provide safe passage for recreational boaters in the region as well as our Federal partners in the Coast Guard.”

Approximately 35,000 cubic yards of sand from phase two will be removed from the channel and will be placed on the nearby Cupsogue Beach. The entire Long Island Intracoastal Waterway Federal Channel is 33.6 miles and traverses the inland waters south of Long Island through the Great South Bay, the Bellport Bay, the Narrow Bay, the Moriches Bay, the Quantuck Bay, and the Shinnecock Bay.

Maintenance of the Long Island Intracoastal Waterway was last performed November 2003 through January 2004. The total volume of dredge material removed from of the Shinnecock Bay Reach in fiscal year 2004 was 26,085 cubic yards of material. Prior to that, the Moriches Bay reach was dredged in fiscal year 2003 with the removal of 53,000 cubic yards of material.

About Us:

New York District is responsible for the Corps of Engineers’ water resource development, navigation, and regulatory activities in northeastern New Jersey, eastern and south-central New York State, including the New York

Harbor and Long Island, and parts of Vermont, Massachusetts, and Connecticut. The District is also responsible for design and construction at Army and Air Force installations in New Jersey, New York, Virginia and overseas in Greenland.

[mappress]

Source: usace , October 20, 2010

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago