Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Mitsui Approved Investment for Robe River J/V Port Expansion in Western Australia
News

December 22, 2010 · about 15 years ago

Mitsui Approved Investment for Robe River J/V Port Expansion in Western Australia

Mitsui & Co., Ltd., approved today the investment of A$ 1.25 billion through its 100% subsidiary Mitsui Iron Ore Development Pty. Ltd. for the expansion of iron ore export capacity at Cape Lambert (also known as Port Walcott), owned by Robe River J/V(Rio Tinto 53%, Mitsui 33%, Others 14%) in the Pil

1 minutes read
  • LinkedIn
  • X
  • Email

Mitsui & Co., Ltd., approved today the investment of A$ 1.25 billion through its 100% subsidiary Mitsui Iron Ore Development Pty. Ltd. for the expansion of iron ore export capacity at Cape Lambert (also known as Port Walcott), owned by Robe River J/V(Rio Tinto 53%, Mitsui 33%, Others 14%) in the Pilbara region of Western Australia, from its current nameplate capacity of 80 million tons to 133 million tons per ann um.

The investment is expected to total A$ 3.78 billion and J/V participants will share the cost pro-rata based on each shareholder’s ratio. Completion of the expansion is scheduled by the end of 2013 calendar year.

[mappress]

Source: businesswire, December 23, 2010

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago