Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Sri Lanka: Major Layup Repairs on Dredger Darshani Prem Completed Sucessfully
News

February 1, 2011 · about 15 years ago

Sri Lanka: Major Layup Repairs on Dredger Darshani Prem Completed Sucessfully

Colombo has been attracting many dredgers for repairs over the past decade from all over the globe, on the good track record the owners automatic choice was Colombo Dockyard for their repairs. The owners Mercator Lines Ltd., have been a regular callers patronising Colombo with their dredgers and tan

2 minutes read
  • LinkedIn
  • X
  • Email

Colombo has been attracting many dredgers for repairs over the past decade from all over the globe, on the good track record the owners automatic choice was Colombo Dockyard for their repairs.

The owners Mercator Lines Ltd., have been a regular callers patronising Colombo with their dredgers and tankers, yard has been servicing their fleet successfully.

The main repair scope consisted of routine drydocking related repairs, during this call the dredger had to be accommodated in drydock twice, initially for the drydocking repairs and subsequently to install the owner supply new propellers and for the fin modification job.

The work scope included installation of new Jet pump Engines (02), Dredging Engines (02) and related piping work, extensive cabling and new foundations, overhauling of both dredge alternators. During the second drydocking the new propellers and shafts were installed after required modifications.

Interesting modification was carried out to improve the speed / performance of the dredger with adaptive fins. 04 Nos. of fins were fabricated and installed successfully. The sea trials indicated increased speed and stable handling. The yards production teams worked tirelessly to meet the stringent deadlines and re-deliver the vessel on schedule to the owners.

During the drydocking call the owner’s interests were looked after by the attending superintendent Engineer Mr.Raj Gudela / Mr. Suresh Achary. The classification society Indian Register of Shipping represented in Sri Lanka requirements were also met by the yard during this call.

The vessel was accommodated at alongside repair berth on arrival and subsequently accommodated in drydock No. 1 and Dock No. 04. The Local Agents –GAC Shipping Ltd, provided the necessary husbanding services for the vessel during her stay in Colombo efficiently.

[mappress]

Source: prlog, February 1, 2011

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago