Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Australia: Rio Tinto Coastal Operations in Pilbara Constrained by Ongoing Adverse Weather Conditions
News

February 21, 2011 · about 15 years ago

Australia: Rio Tinto Coastal Operations in Pilbara Constrained by Ongoing Adverse Weather Conditions

Coastal operations in the Pilbara region continue to be hampered by ongoing weather issues associated with Tropical Cyclones Dianne and Carlos, that are likely to impact on shipped tonnage for the first quarter of this year. TC Carlos is currently 100 kilometres north-west of Broome, moving in a wes

2 minutes read
  • LinkedIn
  • X
  • Email

Coastal operations in the Pilbara region continue to be hampered by ongoing weather issues associated with Tropical Cyclones Dianne and Carlos, that are likely to impact on shipped tonnage for the first quarter of this year.

TC Carlos is currently 100 kilometres north-west of Broome, moving in a west-southwest direction at a speed of 20 kilometres per hour. It is expected to impact the Pilbara coast from early Tuesday morning, bringing heavy rain and strong winds.

Despite ongoing challenges, operations have been maintained at all 14 mines across the region. Dampier and Port Walcott (Cape Lambert) operations have continued intermittently since 14 February 2011, with frequent interruptions from the excessive rainfall, swells and winds. The reformed TC Carlos required the tie-down of all port operations from later today.

The conditions led to a partial derailment late on 17 February, when a loaded train damaged a single-line section of track 35 kilometres south of Dampier. This has prevented trains from entering Dampier, and is not expected to be fully repaired until later this week.

Train movements to Port Walcott (carrying all Robe Valley and Yandicoogina products) have remained unaffected from the derailment, but are now also suspended as part of the tie-down in advance of TC Carlos.

Rio Tinto iron ore will review the impact on stock levels and shipping schedules as a result of the conditions. As is normal practice, where appropriate, scheduled maintenance projects have been brought forward to facilitate a quick return to normal rail and shipping operations when conditions allow.

About Rio Tinto

Rio Tinto is a leading international mining group headquartered in the UK, combining Rio Tinto plc, a London and NYSE listed company, and Rio Tinto Limited, which is listed on the Australian Securities Exchange.

Rio Tinto’s business is finding, mining, and processing mineral resources. Major products are aluminium, copper, diamonds, energy (coal and uranium), gold, industrial minerals (borax, titanium dioxide, salt, talc) and iron ore. Activities span the world but are strongly represented in Australia and North America with significant businesses in South America, Asia, Europe and southern Africa.

[mappress]

Source: riotinto, February 21, 2011

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago