Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›The Netherlands: First Quay Section at Maasvlakte 2 Gets Wet
News

June 22, 2011 · about 15 years ago

The Netherlands: First Quay Section at Maasvlakte 2 Gets Wet

Last week, first deep sea quay wall section, of 250 meters, at Maasvlakte 2 has been dredged free from sand. In the beginning of may, contractor PUMA started to dredge the first basin of the new port area. The first section of 500 meters will be delivered to the port of Rotterdam Authority in Octobe

1 minutes read
  • LinkedIn
  • X
  • Email

Last week, first deep sea quay wall section, of 250 meters, at Maasvlakte 2 has been dredged free from sand. In the beginning of may, contractor PUMA started to dredge the first basin of the new port area. The first section of 500 meters will be delivered to the port of Rotterdam Authority in October. The quay will be used by vessels used for port construction until the first container vessels moor, as is expected, in 2013.

The concrete quay walls of the furure container terminal of Rotterdam World Gateway (RWG) are constructed in terrain that was raised with a sand-water-slurry. Now, after completion of the quay wall, the sand is extracted from the water side by the cutter ‘Zuiderklip’. This sand is used to raise other terrains at Maasvlakte 2 further. Within three weeks, 500 meters of quay wall will be wet and the water itself will be deepened further. Eventually, the Maasvlakte 2 docks will be 20 meters deep.

[mappress]

Source: portofrotterdam, June 22, 2011;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 9 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 9 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago