Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›Germany: Hamburg Port Authority Unveils Plan for Quay Rebuilding
News

September 9, 2011 · about 15 years ago

Germany: Hamburg Port Authority Unveils Plan for Quay Rebuilding

Hamburg Port Authority has announced plans for rebuilding of Little Grasbrook Hansa port quay. The wharf is located in Bremen, Hamburg-Mitte district in the district on the south side of Little Grasbrook Hansa port. The 300m long quay, including the Hansahöftes should be fundamentally overhauled. To

1 minutes read
  • LinkedIn
  • X
  • Email

Hamburg Port Authority has announced plans for rebuilding of Little Grasbrook Hansa port quay.

The wharf is located in Bremen, Hamburg-Mitte district in the district on the south side of Little Grasbrook Hansa port.

The 300m long quay, including the Hansahöftes should be fundamentally overhauled.

To restore the stability of the quay, a new-anchored sheet pile wall with concrete capping beam in front of the old quay wall is required.

In some areas, the new quay wall will be lined with with existing sandstone blocks.

The Hoeft, especially the existing staircase will be disassembled and about 10m from the existing Höftspitze rebuilt.

Dredging silt: 15 000 m³;

Earthworks: about 25 000 m³;

Demolition of the existing quay wall: string posts, ladders, etc;

Partial demolition of the existing quay wall (masonry): approximately 700 m³;

Supply and installation of sheet piling: about 1 400 t;

Tie back the new quay wall by injection piles: approx 7,400 m;

Producing a concrete Holmes: about 800 cubic meters;

Masonry demolition and renovation: 170 sqm;

Supply and installation of equipment quay: barges holders, bollards, Ladders, navigation markers.

[mappress]

Source: Hamburg Port Authority, September 9, 2011;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free