Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Van Oord to Conduct First Subsea Rock Installation Project in Mexico
Business & Finance

November 1, 2011 · about 14 years ago

Van Oord to Conduct First Subsea Rock Installation Project in Mexico

Van Oord‘s flexible fallpipe vessel (FFPV) Tertnes has been to the east coast of Mexico (Bay of Campeche) to execute subsea rock installation projects on pipelines and cables for various main contractors. The ultimate client is state oil and gas company PEMEX. FFPV vessel Tertnes was deployed to the

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord‘s flexible fallpipe vessel (FFPV) Tertnes has been to the east coast of Mexico (Bay of Campeche) to execute subsea rock installation projects on pipelines and cables for various main contractors. The ultimate client is state oil and gas company PEMEX.

FFPV vessel Tertnes was deployed to the Far East via the Panama Canal to guarantee a timely commencement of the works in Mexico. Supported by the local offices in Houston and Mexico City, the operations will take place in the fourth quarter of 2011. This project is Van Oord’s first ever rock installation project in Mexico.

Subsea rock installation technique is very suitable for ensuring stabilisation and protection in the uneven seabed conditions in the Gulf of Mexico. Here, rock outcrops and reefs require a proper preparation of the seabed before and after the installation of pipelines and cables. Van Oord has an extensive track record on executing similar works all over the world.

For FFPV Tertnes, this is the second job in Latin America in one year. In late 2010, the vessel completed a pipeline stabilisation project for Brazilian oil and gas operator Petrobras in Manaus, Amazonas State, Brazil.

Van Oord operates two other state-of-the-art flexible fallpipe vessels. FFPV Stornes (27,000 tonnes), operational since late September 2011, and FFPV Nordnes (24,000 tonnes) are currently both working on rock installation projects in the Norwegian sector of the North Sea.

[mappress]

Source: vanoord, November 1, 2011

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago