DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›India: Inland Waterway Project Still on Paper
News

December 15, 2011 · about 14 years ago

India: Inland Waterway Project Still on Paper

Inland waterways are ideal for Kochi. Land acquisition or rehabilitation problems don’t come in its way but there are other hurdles to be crossed for implementing the project. Though the Inland Waterway Authority of India (IWAI) has implemented the National Waterway-3, of which the Kollam-Kottappura

2 minutes read
  • LinkedIn
  • X
  • Email

Inland waterways are ideal for Kochi. Land acquisition or rehabilitation problems don’t come in its way but there are other hurdles to be crossed for implementing the project. Though the Inland Waterway Authority of India (IWAI) has implemented the National Waterway-3, of which the Kollam-Kottappuram stretch of the Kasargod-Kovalam project is almost ready, the waterway project mooted for Kochi is still on paper thanks to the apathy of the Water Resources Department.

Studies have been conducted but the state government is yet to take up the issue. Silt-filled canals, their size, the bridges over them, fishing nets, water hyacinths and objections from the public come in the way of making waterways in Kochi a reality.

“ First of all, the Edappally canal, Thevara-Perandoor canal, Chilavannor Thodu, Thevara canal and market canal, identified for the project are highly silted. All the canals have to be dredged ,” said Satheesh B Nair of Inland Water Transport, National Transport Planning and Research Centre.

The bridges over the canals are another problem. “ The bridges over Rameswaram canal and Edappally canal, the NH bridge over the Chilavanoor canal and the Vytilla bridge are not high. The height of the bridge must be 5.5 metres for national waterways but no norms have been set for other waterways ,” he said.

The bridge divides the Thevara canal into two and it has to be considered as two independent canals. Moreover, encroachments are rampant on canal sides. As a result, they turn narrow and polluted. The canals must at least be 14 m wide and 2.2 m deep.

Water weeds and water hyacinths also hinder the project. The weeds tend to coil around the radar and effect engine functioning.

Fishing nets and the depth availability also hinder the work, besides the local objections, said N Sivaraman, director, IWAI. The authority has developed the Amabalamedu, Eloor, Maradu, Udyogamandal and Chambakkara terminals. The work on the Irumpanam terminal is still going on.

Water ways are eco-friendly. “ Interface of tides and mechanical agitation of boats will keep the water in the canals healthy, ” said Satheesh.

[mappress]

Dredging Today Staff, December 15, 2011;

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago