DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›USA: Port of Los Angeles, Army Corps Release EIS/EIR for APL Container Terminal Project
News

December 18, 2011 · about 14 years ago

USA: Port of Los Angeles, Army Corps Release EIS/EIR for APL Container Terminal Project

The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Berths 302-306 APL Container Terminal Project that involves the improvement and expansion of the existing 291-acre terminal by 56 acres. APL operates the second larg

1 minutes read
  • LinkedIn
  • X
  • Email

The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Berths 302-306 APL Container Terminal Project that involves the improvement and expansion of the existing 291-acre terminal by 56 acres. APL operates the second largest container terminal at the Port of Los Angeles.

The proposed project calls for the development of 1250 feet of new wharf and 41 acres of backland with planned state-of-the-art infrastructure, including 12 new cranes and Alternative Maritime Power™ (AMP™) facilities. The existing 41-acre adjacent fill was constructed from dredged harbor materials as part of the Main Channel Deepening project.

The Draft EIS/EIR assesses the proposed improvements to the terminal and projected container throughput under the current lease term with APL that expires in 2027. The environmental document includes a discussion of the proposed project’s environmental impacts and identifies mitigation measures to reduce these impacts as required under the National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA). Six project alternatives are also presented as part of the study.

The public comment and review period is from December 16, 2011 to February 17, 2012. During this time, the Port will accept written comments and will host a public meeting on January 19, 6 p.m., at the Port of Los Angeles Administration Building to present its findings and provide opportunity for public comment.

[mappress]

Dredging Today Staff, December 19, 2011; Image: portoflosangeles

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago