DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›Belgium: Beverdonk Container Terminal Almost Ready
News

December 21, 2011 · about 14 years ago

Belgium: Beverdonk Container Terminal Almost Ready

This Friday, 23 December, the mobile container crane for the new Beverdonk Container Terminal on Albertkanaal, will be delivered. Precisely a week earlier, the terminal itself was completed. It will become operational at the beginning of 2012. The terminal currently occupies 2.5 ha and has a 200-met

1 minutes read
  • LinkedIn
  • X
  • Email

This Friday, 23 December, the mobile container crane for the new Beverdonk Container Terminal on Albertkanaal, will be delivered.

Precisely a week earlier, the terminal itself was completed. It will become operational at the beginning of 2012. The terminal currently occupies 2.5 ha and has a 200-metre quay. It can cope with an annual 60,000 TEU of containers. In time, the surface area of the terminal can be extended to 10 ha. and the quay to 500 metres. The terminal capacity will then be 300,000 TEU. A total of four container cranes will then be deployed.

The DP World terminal is available to any user and for departures to any seaport, and will initially be open from 6 a.m. to 10 p.m. In time, this will be 24/7.

They are aiming at 80% bundling of containers at the terminal and 20% local volume. The latter is linked, among other things, to logistics platforms which are being developed in phases on both sides of the terminal. Between now and 2020, the headroom of all bridges on Albertkanaal will be raised to 9.20 metres, making container shipping with four layers of containers possible.

[mappress]

Dredging Today Staff, December 22, 2011;

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago