DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›Mozambique: Kenmare Resources Presents Moma Expansion Update
News

December 22, 2011 · about 14 years ago

Mozambique: Kenmare Resources Presents Moma Expansion Update

Kenmare Resources plc has announced Moma Expansion Update as follows: PHASE 2 EXPANSION Key Milestones Achieved – Dredge manufacture complete, Factory Acceptance Tests passed and dredge at site being offloaded – Engineering design – 80% of hours completed • Structural design complete • Only final de

1 minutes read
  • LinkedIn
  • X
  • Email

Kenmare Resources plc has announced Moma Expansion Update as follows:

PHASE 2 EXPANSION

Key Milestones Achieved

– Dredge manufacture complete, Factory Acceptance Tests passed and dredge at site being offloaded

– Engineering design – 80% of hours completed

• Structural design complete

• Only final detailing and construction as-built drawings remaining

– Equipment procurement – 83% complete

– Construction:

• Civil, mechanical and electrical contracts placed and work under way

• 374 bed construction camp complete

• Wet Concentrator Plant A (WCP A) upgrade complete and commissioned

• Wet Concentrator Plant B (WCP B) construction pond complete

• Foundations and concrete for product store and Wet High Intensity Magnetic Separation (WHIMS) circuit is well advanced

– Beach landing system in place and operating well.

PHASE 2 EXPANSION

Mining

• EXISTING Wet Concentrator Plant A (WCP A)

¾ Upgrade two existing dredges

¾ Upgrade WCP A to increase spiral feed capacity from 3,000 to 3,500 tph

• NEW Wet Concentrator Plant B (WCP B)

¾ Installation of 2nd mining plant consisting of:

• WCP with spiral feed capacity of 2,000 tph

• Starter pond

• 3rd dredge

• WCP spirals modular design allows for easier future capacity increases

• Addition of WCP B will not interfere with existing operations

• Planned WCP B move to the Nataka deposit in 2020 and WCP A in 2024.

More info: kenmareresources

[mappress] Dredging Today Staff, December 22, 2011; Image: kenmareresources

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free