Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›Russia: Future Looks Great for Port of Saint Petersburg
News

February 9, 2012 · about 14 years ago

Russia: Future Looks Great for Port of Saint Petersburg

In 2011 JSC “Sea Port of Saint-Petersburg” transferred 319 mln. rubles for the implementation of port infrastructure development programme. Main part of the funds was transferred for the renovation of the fleet of handling equipment. In particular 9 lift-trucks “Kalmar” with the lifting capacity fro

2 minutes read
  • LinkedIn
  • X
  • Email

In 2011 JSC “Sea Port of Saint-Petersburg” transferred 319 mln. rubles for the implementation of port infrastructure development programme.

Main part of the funds was transferred for the renovation of the fleet of handling equipment. In particular 9 lift-trucks “Kalmar” with the lifting capacity from 10 up to 33 tons for handling of general cargoes, terminal tractor for the transportation of cargoes on roll-trailers with the weight up to 32 tons and 40’ roll-trailer with the lifting capacity of 70 tons were delivered last year.

FSUE Rosmorport is set to begin dredging at Port of St. Petersburg outer harbor in 2012, as part of the firs phase of the marine terminal project.

As Rosmorport’s North-West branch CEO Sergey Pylin said, the federal enterprise also plans to begin dredging in 2013 for another outer harbor project to be based in the area of Litke (Kronstadt).

2 mobile rubber-tyred Liebherr cranes LHM 600, suitable for handling of cargoes with the weight up to 140 tons were also delivered to the berths of the company.

New equipment will allow to increase the intensity of handling of cargoes and to decrease the expenses for maintenance and renovation of handling equipment.

Besides, starting from the beginning of 2011 works on reconstruction of railway tracks and facilities for smooth running of trains have been carried at the first and second cargo areas of the port. It is planned that all these measures will allow to increase the throughput capacity of the terminals for handling of metals up to 500 thousand tons per month.

[mappress]

Dredging Today Staff, February 9, 2012; Image: seaport

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago