Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›USA: Army Corps Delays Burnsville Lake Draw Down
News

February 10, 2012 · about 14 years ago

USA: Army Corps Delays Burnsville Lake Draw Down

Plans by the U.S. Army Corps of Engineers to draw down Burnsville Lake two feet below normal winter pool have been delayed because of weather conditions. The draw down was planned to allow dredging and maintenance on the Riffle Run Boat Launch Ramp behind the dam. Because of siltation, for the last

1 minutes read
  • LinkedIn
  • X
  • Email

Plans by the U.S. Army Corps of Engineers to draw down Burnsville Lake two feet below normal winter pool have been delayed because of weather conditions.

The draw down was planned to allow dredging and maintenance on the Riffle Run Boat Launch Ramp behind the dam.

Because of siltation, for the last two years it has not been possible to launch a boat while the lake was at winter pool elevation.

The work will be rescheduled for later this year.

[mappress]

Dredging Today Staff, February 10, 2012; Image: usace

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago