Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›News›UK: Portsmouth Naval Base Development Plan Includes Dredging
News

February 16, 2012 · about 14 years ago

UK: Portsmouth Naval Base Development Plan Includes Dredging

Production on HMS Prince of Wales, the second Queen Elizabeth Class aircraft carrier, has started yesterday at BAE Systems in Portsmouth Naval Base – the future home of the Queen Elizabeth Class. Work on the forward section of the hull, known as Lower Block 02, commenced as Commander-in -Chief Fleet

2 minutes read
  • LinkedIn
  • X
  • Email

Production on HMS Prince of Wales, the second Queen Elizabeth Class aircraft carrier, has started yesterday at BAE Systems in Portsmouth Naval Base – the future home of the Queen Elizabeth Class.

Work on the forward section of the hull, known as Lower Block 02, commenced as Commander-in -Chief Fleet Admiral George Zambellas cut the first steel in a ceremony at the company’s production facility. The huge section, which will weigh around 6,000 tonnes upon completion, will house the ship’s machinery spaces, stores and switchboards, as well as some of the accommodation, including 85 cabins.

Integration and testing of the ship’s complex mission system is currently underway at the company’s Maritime Integration and Support Centre on Portsdown Hill, whilst teams of engineers from BAE Systems and Thales are testing the advanced communications systems for the ships. Elsewhere in the Hampshire region, Southampton-based Kempsafe Limited has contracts to supply galley and laundry equipment on the vessels and Portsmouth-based Selex Communications is involved in the design of the Identification Friend or Foe system.

A significant plan of investment is underway to enhance the Naval Base, which will become the home of the two aircraft carriers when they enter service. The plan, which will cost approximately £140 million, includes the dredging the existing channel to Portsmouth to make it deeper and wider, and refurbishing the base’s jetties to ease access for both the QE Class and Type 45 fleet.

Each 65,000 tonne aircraft carrier will provide the armed forces with a four acre military operating base which can be deployed worldwide. The vessels will be versatile enough to be used for operations ranging from supporting war efforts to providing humanitarian aid and disaster relief.

The QE Class will be the centre piece of Britain’s military capability and will routinely operate at least 12 of the carrier variant Joint Strike Fighter jets, allowing for unparalleled interoperability with allied forces.

[mappress]

Dredging Today Staff, February 17, 2012; Image: baesystems

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago