Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Damen Shipyards Constructs DMD 4020 for Djibouti
News

February 21, 2012 · about 14 years ago

Damen Shipyards Constructs DMD 4020 for Djibouti

Damen Shipyards announced that a Damen Modular Dock (DMD) 4020 is being constructed for – and will be delivered to – Djibouti. Djibouti’s busy port is one of the most important gateways to the African continent and is strategically located at the confluence of the Red Sea and the Indian Ocean. Besid

2 minutes read
  • LinkedIn
  • X
  • Email

Damen Shipyards announced that a Damen Modular Dock (DMD) 4020 is being constructed for – and will be delivered to – Djibouti.

Djibouti’s busy port is one of the most important gateways to the African continent and is strategically located at the confluence of the Red Sea and the Indian Ocean. Besides maintenance of the Port Authorities’ own fleet, the dock will be used for repair and maintenance of port-calling vessels.

The dock, that measures 50 x 20 m, is to be used for repair and maintenance of the Authorities’ fleet, which consists of various supporting vessels such as tugs, shoal busters and pilot vessels. The delivery of the DMD 4020, currently under construction in Dubai, is scheduled for the second half of 2012. After testing in Dubai and delivery of the dock in Djibouti, a Damen Services team will stay on location for two years to give operational and technical support. Damen Services in Gorinchem (The Netherlands) will support the dock operations by supplying parts, equipment and expertise.

Damen Modular Dock 4020

The practical and competitive dock can be built worldwide and can be used in various types of marine circumstances. It can also be outfitted with cranes, accommodation units, roller blocks, workshop units, sandblast curtains and dock mooring systems. In fact, with an ISO 14001 certification, it lives up to the latest standards in environmental care. The design incorporates such features as low emission motors, LED lighting and dedicated systems for waste management and spills avoidance.

The secret lies in the simplicity of the construction, consisting of two wing walls that are coupled to a number of individual pontoons. Marcel Karsijns, Manager Special Projects , says: “ Every unit measures 10 metres. You can enlarge the dock to a length of 100 metres whenever you choose. Modules and wing walls are coupled afloat. It’s equally simple to unlock the components. You can upkeep and repair these modules in the dock itself, making the dock self-maintaining. In addition, the dock contributes to the uptime and success of our customer’s fleet .”

[mappress]

Dredging Today Staff, February 21, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago