Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Arma Corps Deactivates Phase I Flood Fight (USA)
News

February 23, 2012 · about 14 years ago

Arma Corps Deactivates Phase I Flood Fight (USA)

Water levels along the Mississippi River continue to drop, prompting the U.S. Army Corps of Engineers to deactivate Phase I flood fight inspections. As a result of this deactivation, all permitted construction work near levees and floodwalls along or near the river may now resume. The Corps activate

1 minutes read
  • LinkedIn
  • X
  • Email

Water levels along the Mississippi River continue to drop, prompting the U.S. Army Corps of Engineers to deactivate Phase I flood fight inspections. As a result of this deactivation, all permitted construction work near levees and floodwalls along or near the river may now resume.

The Corps activated phase I flood fight as a proactive measure on February 7, 2012, when the Mississippi River rose above 11 feet. The levee patrols associated with phase I activation help ensure the Corps and the local levee authorities can respond quickly to problem areas that may develop along the levee system due to the elevated water levels. In addition, restrictions were placed on all construction activity near the river levees and floodwalls in accordance with their respective permits.

Typically, high water season occurs in the spring, but heavy rainfall in the Mississippi River Valley this winter slowly increased water levels. Although the river level is still above average, it is beginning to drop. The water level at the Carrollton Gauge as of 7:00 AM yesterady was 9.6 feet.

No significant issues developed along any of the levees as a result of this recent high water. The Corps will continue to keep a watchful eye on water levels as the spring flood season approaches.

[mappress]

Dredging Today Staff, February 24, 2012; Image: usace

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago