Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›UK: Berth Extension Begins at Portsmouth International Port
News

February 28, 2012 · about 14 years ago

UK: Berth Extension Begins at Portsmouth International Port

A major construction project starts this week at Portsmouth International Port to lengthen one of the berths used by ferries and cruise ships. Berth 2 will be extended by nearly 50 metres. This will improve flexibility at the Port, allowing for a greater number of larger ships to be docked at any on

2 minutes read
  • LinkedIn
  • X
  • Email

A major construction project starts this week at Portsmouth International Port to lengthen one of the berths used by ferries and cruise ships.

Berth 2 will be extended by nearly 50 metres. This will improve flexibility at the Port, allowing for a greater number of larger ships to be docked at any one time, and until now the largest vessel able to use the Port has been 210 metres. With the Berth 2 extension this will now increase to 240 metres.

The multi-million pound project has been approved by Portsmouth City Council, owners of the Port. The investment will help secure current customers and attract additional trade, as ships continue to grow in size. In turn, this will help to protect jobs at Portsmouth International Port and in the wider local economy.

Phil Gadd, Ferry Port Manager of Portsmouth International Port , says, “ We can never afford to rest on our laurels, and must continue to develop our facilities. Doing nothing is not a viable option as it has became clear that ferry and cruise ship operators are keen to bring bigger ships to Portsmouth. The newly extended berth will offer them a chance to grow their business, and help us sustain jobs in the City ”.

The berth will be extended by the construction of two berthing ‘dolphins’, which are connected by walkway bridges. The ‘dolphins’ are built using seven steel piles being sunk into the seabed and placing a prefabricated structure on top of the piles to form the decking.

Local contractors, Trant, have won the contract to construct the extension, and hope to have the work completed by Easter – in time for the start of the busy summer ferry and cruise seasons. There will be no disruption to ferry timetables.

[mappress]

Dredging Today Staff, February 28, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago