Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Spain: Port of Barcelona Reaches Important Milestone
News

March 8, 2012 · about 14 years ago

Spain: Port of Barcelona Reaches Important Milestone

Terminal Catalunya (TERCAT), a member of the Hutchison Port Holdings Group, took delivery of four Super-Post-Panamax quay cranes at its Muelle Prat terminal in the Port of Barcelona. This is the first batch of a total of eight cranes with the remaining four scheduled for delivery on 18 March 2012. A

2 minutes read
  • LinkedIn
  • X
  • Email

Terminal Catalunya (TERCAT), a member of the Hutchison Port Holdings Group, took delivery of four Super-Post-Panamax quay cranes at its Muelle Prat terminal in the Port of Barcelona. This is the first batch of a total of eight cranes with the remaining four scheduled for delivery on 18 March 2012.

A ceremony was held at Muelle Prat to celebrate the arrival of the new quay cranes. The ceremony was attended by over 60 guests including the Counselor of the Generalitat of Catalunya, Luis Recoder, the President of the Port of Barcelona, Sixte Cambra, representatives of the Government and the municipalities of Barcelona and El Prat de Llobregat, Vice President, Senior Engineer from ZPMC, Fred Huang, and shipping line executives.

Commenting on the new equipment, Clemence Cheng, Managing Director of HPH Central Europe Division , said “ We are very pleased to receive these cranes in Muelle Prat. This is another important milestone towards the completion of this new terminal, which is scheduled to open in mid 2012 .”

“ Muelle Prat will be the first semi-automated terminal in the HPH Group. The nGen operating system will deliver high productivity as well as efficiency. With the eight tracks rail facility connecting this terminal to the European rail network, Barcelona will be an important Mediterranean gateway for Southern and Central European cargo .” he continued.

Sixte Cambra, President of the Port Authority of Barcelona , said, “ The opening of Muelle Prat will be the most important event this year for the Port of Barcelona, not only for the qualitative jump of having the most advance container facility in the Mediterranean, but especially because it will effectively mark the start of our big expansion at the Port of Barcelona. The civil works at Muelle Prat are progressing well and on schedule .”

Alejandro Kouruklis, General Manager of TERCAT , said, “ These new quay cranes are equipped with the latest technology and will be able to handle the biggest vessels in service. Together with the 36 automated stacking cranes, the new quay cranes will significantly increase productivity levels at the Port of Barcelona .”

The 1,700-tonne cranes were built by Zhenhua Port Machinery Company (ZPMC) and have an outreach of 22 containers. They have a height of 42 metres under spreader and a maximum lifting capacity of 61 tonnes. Muelle Prat will have a total area of 100 hectares and a quay length of 1,500 metres. The terminal will have an annual handling capacity of 2.65 million TEU.

[mappress]

Dredging Today Staff, March 8, 2012; Image: hph

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago