Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Stabilization Project at Norriego Point Underway (USA)
News

March 13, 2012 · about 14 years ago

Stabilization Project at Norriego Point Underway (USA)

A temporary stabilization project for the Norriego Point in Destin is being undertaken however the contractors are in a crisis situation since the permit to dredge expires on March 18, reports The Destin Log. Winter storms have caused erosion resulting in the mouth of the harbor filled with sand. Th

1 minutes read
  • LinkedIn
  • X
  • Email

A temporary stabilization project for the Norriego Point in Destin is being undertaken however the contractors are in a crisis situation since the permit to dredge expires on March 18, reports The Destin Log.

Winter storms have caused erosion resulting in the mouth of the harbor filled with sand. The workers are laying down sheet piling to secure the point and are also installing pipelines to begin dredging-out the sand on Tuesday.

Reportedly, 25% of the job has already been completed and the workers expect to finish the project by the deadline. Following these undertakings, city officials will pursue a more permanent solution to the on-going erosion.

[mappress]

Dredging Today Staff, March 13, 2012;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 9 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 9 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago