Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Spain: TERCAT Takes Delivery of Four Cranes for Muelle Prat Terminal
News

March 20, 2012 · about 14 years ago

Spain: TERCAT Takes Delivery of Four Cranes for Muelle Prat Terminal

On March 16, TERCAT took delivery of four Super-Post-Panamax quay cranes for its new container terminal at Muelle Prat, making a total of eight such cranes at the facility. TERCAT, a member of the Hutchison Port Holdings Group, received the first four quay cranes for Muelle Prat on 6 March. The cran

1 minutes read
  • LinkedIn
  • X
  • Email

On March 16, TERCAT took delivery of four Super-Post-Panamax quay cranes for its new container terminal at Muelle Prat, making a total of eight such cranes at the facility.

TERCAT, a member of the Hutchison Port Holdings Group, received the first four quay cranes for Muelle Prat on 6 March. The cranes have a height of 42 metres under spreader and weigh approximately 1,700 tonnes. They each have a maximum load capacity of 61 tonnes and an outreach of 22 container rows.

TERCAT has already taken delivery of other terminal equipment for Muelle Prat including 15 Automatic Stacking Cranes (ASC), and 11 Shuttle Carriers, used to transport containers from the quay side to the yard. The ASCs are one-over-five models and span nine container rows. A further 21 ASCs and nine shuttle carriers are on order.

The advanced semi-automatic equipment that will be used at Muelle Prat is expected to increase the efficiency of its operations, especially when servicing mega-vessels.

The terminal is scheduled to be operational in mid-2012. It will have 1,500 metres of quay, a draught of 16.5 metres and a 100 hectare yard.

[mappress]

Dredging Today Staff, March 20, 2012; Image: TERCAT

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago