Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›APM Terminals: Ports Must Prepare for Ultra-Large Vessels (China)
News

March 21, 2012 · about 14 years ago

APM Terminals: Ports Must Prepare for Ultra-Large Vessels (China)

APM Terminals Crane & Engineering Services’ Managing Director, Halfdan Ross, discussed solutions to the challenges presented by the latest and future generation of Ultra-Large Container Vessels (ULCV) that confront port and terminal operation and design at the TOC Container Supply Chain Asia Confere

2 minutes read
  • LinkedIn
  • X
  • Email

APM Terminals Crane & Engineering Services’ Managing Director, Halfdan Ross, discussed solutions to the challenges presented by the latest and future generation of Ultra-Large Container Vessels (ULCV) that confront port and terminal operation and design at the TOC Container Supply Chain Asia Conference in Hong Kong.

Addressing the topic “ Terminal Planning & Operations: Driving New Performance Efficiencies ”, Mr. Ross examined issues and solutions applicable to quay cranes intended to accommodate the larger vessels entering into service in the global container fleet, as well as the design or reinforcement of the quays themselves.

“ While none have been ordered yet, studies have been completed on the feasibility of constructing containerships with a 22,000 TEU capacity” noted Mr. Ross, adding “so planning for crane and other infrastructure support to accommodate such vessels and their container volumes is a very necessary exercise for any major hub port ”.

As of February 1st there were 153 containerships on order with capacities in excess of 10,000 TEUs, including 20 of the 18,000 TEU capacity EEE Class vessels ordered by Maersk Line, the first of which is expected for delivery next year. There are currently 121 vessels of 10,000 TEU capacity and above in service.

“ There are issues of structural stiffness, weight, visibility and wind load which all must be taken into account with cranes of such dimensions, along with the question of upgrading existing equipment or installing new cranes entirely ” explained Mr. Ross.

Improved engineering, camera-assisted and remote control of the crane operations were some of the solutions presented, though increased power requirements may also pose obstacles, particularly in emerging market areas with power generation or supply issues.

CES has been playing a major role in maintaining the readiness of the APM Terminals Global Port and Terminal Network for handling ULCVs such as the EEE Class vessels at key load centers and hub facilities.

“ The point is that ultra-large vessels are already in service, and even larger vessels will follow, and so the time to prepare the necessary terminal and quay infrastructure is now ” said Mr. Ross.

[mappress]

Dredging Today Staff, March 21, 2012; Image: APM Terminals

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago