Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Santa Cruz Harbor Dredging Nears Completion (USA)
News

March 28, 2012 · about 14 years ago

Santa Cruz Harbor Dredging Nears Completion (USA)

The Santa Cruz Harbor dredging began for the 2011-12 season on Monday, November 28, 2011, and will continue through April 30, 2012. The sandy material dredged from the federal entrance channel will be disposed of east of the east jetty, using a combination of beach, nearshore and offshore disposal.

2 minutes read
  • LinkedIn
  • X
  • Email

The Santa Cruz Harbor dredging began for the 2011-12 season on Monday, November 28, 2011, and will continue through April 30, 2012. The sandy material dredged from the federal entrance channel will be disposed of east of the east jetty, using a combination of beach, nearshore and offshore disposal.

Dredging of the harbor is required because of the constant easterly movement of sand along the coast and thus, across our harbor entrance. Such movement is generated by the ongoing forces of waves and currents. The amount of material moved and deposited is directly proprtional to the serverity of current and wave conditions. This constant movement of masses of sand is termed littoral drift.

Sand is carried down the San Lorenzo River and thence moved down-coast by wave and tidal action called littoral drift. Constantly moving, the sand mass builds up against the west jetty and flows around it, shoaling the Santa Cruz Harbor entrance channel. Impeding sand is then dredged from the entrance channel and deposited in the inter-tidal zone where the existing littoral drift carries it down-coast, nourishing those beaches east of the Santa Cruz Harbor entrance.

Because of sand incursion at the mouth of the harbor, it is essential that an annual dredging effort be maintained to assure sufficient depth at the harbour entrance to permit the safe passage of vessels transiting the entrance. Shoaling conditions caused by littoral sand drift produce dangerous and unpredictable breaking wave formations at the harbor’s entrance. These breaking waves are extremely hazardous to incoming, and outgoing vessels and pose a particular danger to individuals walking on either of the jetties.

[mappress]

Dredging Today Staff, March 29, 2012; Images: santacruzharbor

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago