Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USA: Marmon Utility Seeks Corps Permit to Remediate Bladens River Streambank Damages
News

April 1, 2012 · about 14 years ago

USA: Marmon Utility Seeks Corps Permit to Remediate Bladens River Streambank Damages

Marmon Utility, LLC is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with remediating streambank damages along Bladens River in Seymour, Conn. Marmon Utility, LLC sustained significant streambank damages alo

2 minutes read
  • LinkedIn
  • X
  • Email

Marmon Utility, LLC is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with remediating streambank damages along Bladens River in Seymour, Conn.

Marmon Utility, LLC sustained significant streambank damages along the Bladens River during Hurricane Irene at its Keyrite facility in Seymour. This project seeks to permanently remediate those damages by reconstructing retaining walls and creating rip rap embankments where the pre-existing embankments failed.

The work includes the discharge of dredged or fill material in order to remediate storm related damages to the existing embankments following storm events from August 2011.

The Kerite facility is a campus located at 49 Day Street in Seymour along the Bladens River immediately downstream of the 19.5-foot-high Kerite Dam. During an Aug. 14, 2011 storm event flash flooding of the channel resulted in complete failure of two retaining walls and a gabion basket armored embankment, behind which, utilities were located. The failure of these embankments jeopardized those utilities as well as the safety of employees. Temporary rip rap was installed in order to stabilize the banks and prevent further damage, for which emergency authorization was granted. This project intends to permanently remediate the damages incurred during this storm and remove the interim protective measures.

The project will result in the permanent placement of approximately 12,000 square feet of rip rap below the ordinary high water mark. The application for the federal permit was filed with the Corps in compliance with Section 404 of the Clean Water Act, which regulates the discharge or fill of material in United States waters, including wetlands.

[mappress]

Dredging Today Staff, April 2, 2012; Image: usace

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago