Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Australia: Port Curtis Studies Indicate Significant Numbers of Migratory Shorebirds
News

April 3, 2012 · about 14 years ago

Australia: Port Curtis Studies Indicate Significant Numbers of Migratory Shorebirds

Initial studies in Port Curtis indicate internationally significant numbers of migratory shorebirds in the Gladstone region. In a first for the Capricorn Coast, detailed monitoring of migratory shorebirds from Port Curtis to Port Alma has been conducted with initial studies indicating a healthy ecos

2 minutes read
  • LinkedIn
  • X
  • Email

Initial studies in Port Curtis indicate internationally significant numbers of migratory shorebirds in the Gladstone region.

In a first for the Capricorn Coast, detailed monitoring of migratory shorebirds from Port Curtis to Port Alma has been conducted with initial studies indicating a healthy ecosystem with a number of “high priority” sites.

“ We have found some internationally significant populations of migratory shorebirds in the Port Curtis region, ” Ecologist Dr David Rohweder from Sandpiper Ecological Surveys said.

“North Curtis Island and the Fitzroy estuary stand out in the study area as high priority sites for migratory shorebirds.

“A site of international significance is a site that contains greater than one per cent of the known flyaway population. The study area includes several species that exceed one per cent of the known population.”

The Migratory Shorebird Monitoring study is part of the conditions approval for the Western Basin Dredging and Disposal Project and is related to the development of an Ecosystem Research and Monitoring Program (ERMP), which is required to be implemented for a period of no less than 10 years in the Gladstone region.

Sandpiper Ecological Surveys have been commissioned to undertake the migratory shorebirds study.

“The study area is new information as our first surveys were conducted in January 2011, but what it is saying is the study area is an important area for shorebirds, ” Dr Rohweder said.

“The purpose of the surveys is to gather information on the abundance and diversity of migratory shorebirds in the Capricorn Coast region and to get a handle on how important that area is for shorebirds.”

Gladstone Port’s Corporation CEO Leo Zussino said the study indicates the environmental conditions implemented for the Western Basin Dredging and Disposal Project in the Gladstone harbour are working.

“ GPC is committed to carrying out the project with minimal impact to the environment and this study confirms we are moving in the right direction.” Mr Zussino said.

[mappress]

Dredging Today Staff, April 4, 2012; Image: westernbasinportdevelopment

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago