Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Midland Cleanup Hearing Set for Tomorrow (USA)
News

April 15, 2012 · about 14 years ago

Midland Cleanup Hearing Set for Tomorrow (USA)

The DEQ will host an April 17 public hearing to receive oral or written comments on Dow Chemical Company’s work plan to address dioxin contaminated soils in Midland. The hearing is scheduled from 7-9 p.m. at the Grace A. Dow Memorial Library Auditorium, 1710 West St. Andrews Street in Midland. Repre

2 minutes read
  • LinkedIn
  • X
  • Email

The DEQ will host an April 17 public hearing to receive oral or written comments on Dow Chemical Company’s work plan to address dioxin contaminated soils in Midland.

The hearing is scheduled from 7-9 p.m. at the Grace A. Dow Memorial Library Auditorium, 1710 West St. Andrews Street in Midland. Representatives from the DEQ and Dow will be available beginning at 6:30 p.m. to answer questions on a one on one basis.

When the formal hearing commences, a hearings officer will invite interested members of the audience to offer comments for the official record.

The DEQ will consider and provide a written response to all significant public comments as part of the work plan review and approval process. This response will be posted on the “Midland Area Soil Cleanup” DEQ website. Written public comments will be accepted through April 25.

The work plan is for cleanup of soil contaminated by airborne emissions from Dow’s historic waste management practices. It was submitted as part of corrective action work required under the company’s Hazardous Waste Management Facility Operating License.

The conceptual agreement behind the proposed cleanup plan was introduced at a public information meeting March 1 in Midland. If approved, the work plan will require Dow to proceed with offering soil sampling at residential properties in the resolution area and offering cleanup for properties that test above the action level.

Properties that test less than or equal to the action level and those that have had cleanup will not be considered contaminated under Michigan law. Sampling and cleanup work will be done only with the consent of the property owner. Soil sampling is expected to begin in June.

[mappress]

Dredging Today Staff, April 16, 2012;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago