Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Cambodia: CCCC First Harbor Engineering Wins Sihanoukville Terminal Deal
News

April 19, 2012 · about 14 years ago

Cambodia: CCCC First Harbor Engineering Wins Sihanoukville Terminal Deal

On March 20, CCCC First Harbor Engineering Co., Ltd won the bid for the Terminal Construction Project of the 7×135 MW Units of Sihanoukville with a contract value of $73,690,000 dollars. This is the second Project constructed by CCCC First Engineering Co., Ltd after the Section C Project of the 3×13

1 minutes read
  • LinkedIn
  • X
  • Email

On March 20, CCCC First Harbor Engineering Co., Ltd won the bid for the Terminal Construction Project of the 7×135 MW Units of Sihanoukville with a contract value of $73,690,000 dollars.

This is the second Project constructed by CCCC First Engineering Co., Ltd after the Section C Project of the 3×135 MW Units of Sihanoukville. The project includes the construction of two 20,000-ton bulk cargo berths, the wharf of which is high-piled beam-slab structure with a length of 427m, and a plate beam bridge approach with a length of 1,884m; the dredging volume of the project reaches around 2.8 million m³.

The project is scheduled to be completed by October 30, 2013.

[mappress]

Dredging Today Staff, April 20, 2012;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 9 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 9 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago