Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Army Corps Proposes Cuttyhunk Harbor Dredging (USA)
News

April 23, 2012 · about 14 years ago

Army Corps Proposes Cuttyhunk Harbor Dredging (USA)

The U.S. Army Corps of Engineers, New England District is proposing maintenance dredging of Cuttyhunk Harbor Federal Navigation Project in Gosnold, on Cuttyhunk Island, Mass. The authorized Federal Navigation Project provides for a channel, 10 feet deep and 75 feet wide, from the outer harbor to the

3 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District is proposing maintenance dredging of Cuttyhunk Harbor Federal Navigation Project in Gosnold, on Cuttyhunk Island, Mass.

The authorized Federal Navigation Project provides for a channel, 10 feet deep and 75 feet wide, from the outer harbor to the westerly terminal in the inner harbor. It also provides for an anchorage, 10 feet deep, 800 feet wide and 900 feet long, in the inner harbor.

Historically, a sand bar forms in the outer portion of the authorized 10-foot-deep entrance channel from about the end of the jetties to a point in the inner harbor between Copicut Neck and Barge Beach.

“ The shoaling is primarily a result of sand being washed off of Barge Beach and into the channel during winter and spring northeast storms ,” said Project Manager Bill Kavanaugh , of the Corps’ New England District, Programs/Project Management Division. “ This material in the channel limits access to, and egress from the harbor and creates hazardous conditions for commercial and recreational vessels including the ferry which transports passengers and most of the goods to this harbor.”

Maintenance dredging to remove these shoals is typically required every few years. The proposed work involves periodic maintenance dredging, including potentially this year, to remove approximately 15,000 cubic yards of clean sand from the outer portion of the authorized 10-foot-deep entrance channel. Hydrographic surveys performed in 2011 just subsequent to Tropical Storm Irene indicate that the outer portion of the entrance channel has shoaled to -5.4 feet deep.

Contingent upon receiving the necessary approvals, maintenance dredging will be performed during a 2-week period in June 2012, and periodically thereafter, by the Government-owned, special purpose dredge “CURRITUCK.” The last maintenance dredging was performed in 2000 when 7,295 cubic yards of material were removed by the “CURRITUCK” from the outer portion of the 10-foot-deep entrance channel and placed at the nearshore disposal area off of Church’s Beach. Material dredged from the entrance channel will be placed at either the previously used, nearshore disposal area off of Church’s Beach, or if conditions allow, at a nearshore area off of Barge Beach. The Town of Gosnold is the local sponsor for this proposed project.

The proposed work is being coordinated with the following Federal, Tribal Nations, state and local agencies: U.S. Fish and Wildlife Service; U.S. Environmental Protection Agency; National Marine Fisheries Service; Massachusetts Office of Coastal Zone Management; Massachusetts Department of Environmental Protection; Massachusetts Historic Preservation Office; the Mashpee Wampanoag Tribe; the Narragansett Indian Tribe; the Wampanoag Tribe of Gay Head; and the Town of Gosnold Selectmen.

The Corps has assessed the effects the dredging is likely to have and has made a preliminary determination that there will be no significant impacts on resources or the environment. An Environmental Assessment for this work is being prepared and will be available for review.

[mappress]

Dredging Today Staff, April 23, 2012;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago