Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Poland: Authorities Announce Tender for Dredging Work at Szczecin Area
News

April 30, 2012 · about 14 years ago

Poland: Authorities Announce Tender for Dredging Work at Szczecin Area

Urzurd Morski w Szczecinie has announced a tender for improvement and modernisation of the main port, which includes the reconstruction and strengthening of about 8 km of the fairway under the project, Phase II, East and West. The project is located partly in the sea port of Winouj CIU, as well as i

1 minutes read
  • LinkedIn
  • X
  • Email

Urzurd Morski w Szczecinie has announced a tender for improvement and modernisation of the main port, which includes the reconstruction and strengthening of about 8 km of the fairway under the project, Phase II, East and West.

The project is located partly in the sea port of Winouj CIU, as well as in the area and the sea waters inside Trznych.

Works will include:

Disassembling of navigational obstructions (including related demolition of the hydraulics at Dalba, the destroyed pier at the wharf;

Demolition of the quay and bridge on the Island of Meilin;

Construction of a new berth and technical (parking) on the west coast of the Meilin;

Service aids for navigation facilities;

Modernisation of network infrastructure and implementation of a new lighting boundary;

Information signs such as anchoring prohibition signs at the proposed move, cables, marking, working for the duration of the works, etc.);

Strengthening of embankment protection;

Dredging works coordinating with the formation of submarine slope and foundation elements to strengthen the base of the embankment;

Works related in maintaining a current depth of water in the harbour area.

The majority of works will be conducted primarily from the water.

The deadline for this tender is May 28, 2012.

[mappress]

Dredging Today Staff, April 30, 2012;

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free