Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Croatia: Contract Signed for Port of Rijeka New Container Terminal
News

May 8, 2012 · about 14 years ago

Croatia: Contract Signed for Port of Rijeka New Container Terminal

The design and construction contract has been signed at the Port of Rijeka Authority with a consortium of Italian companies and Croatian “Osijek Koteks” for the container terminal at the Zagreb pier. During the tender process for the most favourable bidder for designing and constructing the containe

2 minutes read
  • LinkedIn
  • X
  • Email

The design and construction contract has been signed at the Port of Rijeka Authority with a consortium of Italian companies and Croatian “Osijek Koteks” for the container terminal at the Zagreb pier.

During the tender process for the most favourable bidder for designing and constructing the container terminal, the offer submitted by an Italian and Croatian business association was chosen, namely an Italian consortium composed of the following companies: JV Construction Co.Ed.Mar. S.r.l., Grandi Lavori Fincosit S.p.a., Impresa Construzioni Giuseppe Maltauro S.p.a., and the Croatain company “Osijek-Koteks” d.d. The contract is worth EUR 70.585.015,45 and the first phase of the new container terminal on the Zagreb Pier should be completed by 2017.

The design and construction contract has been signed at the Port of Rijeka Authority with a consortium of Italian companies and Croatian “Osijek Koteks” for the container terminal at the Zagreb pier. During the tender process for the most favourable bidder for designing and constructing the container terminal, the offer submitted by an Italian and Croatian business association was chosen, namely an Italian consortium composed of the following companies: JV Construction Co.Ed.Mar. S.r.l., Grandi Lavori Fincosit S.p.a., Impresa Construzioni Giuseppe Maltauro S.p.a., and the Croatain company “Osijek-Koteks” d.d. The contract is worth EUR 70.585.015,45 and the first phase of the new container terminal on the Zagreb Pier should be completed by 2017.

The Zagreb Pier Container Terminal is one of the basic components of the Rijeka Gateway Project, which first phase of construction will be realised by a loan granted by the World Bank, while the second phase of construction, including complete infrastructure and equipment, would be financed through private investment, modelled on a public and private partnership.

In the first phase of the construction of the Zagreb Pier Container Terminal, 400 metres will be built, while the second phase envisages an extension of the pier to the length of 680 metres. The terminal will be designed to accommodate the largest ships used in container transportation, while the sea depth of 20 m alongside the coast, will enable the berthing of the latest generation of container ships, currently still in the projection phase. The envisaged deadline for the realisation of this project is approximately from four to five years, out of which a year to a year and half is foreseen for designing and obtaining the building permit.

[mappress]

Dredging Today Staff, May 9, 2012; Image: portauthority

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago