Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›DHV Builds New Ports in Ghana
News

May 30, 2012 · about 14 years ago

DHV Builds New Ports in Ghana

Dutch engineering and consultancy firm DHV will be responsible for the construction management of eleven new fishing ports in Ghana. Construction will start in summer 2012 and be completed in 2017. The fishing ports will improve the standard of living of Ghanaians in the coastal provinces and lead t

2 minutes read
  • LinkedIn
  • X
  • Email

Dutch engineering and consultancy firm DHV will be responsible for the construction management of eleven new fishing ports in Ghana.

Construction will start in summer 2012 and be completed in 2017. The fishing ports will improve the standard of living of Ghanaians in the coastal provinces and lead to a more durable way of fish consumption. The cost of construction totals 200 million dollars.

The Ghana Ports and Harbours Authority had earlier contracted DHV to produce the master plans and designs for the ports. Ben Reeskamp, DHV’s Director of Ports and Waterways , said: ‘ Together with the local population we examined their needs and the places where the ports could best be built. This provided the basis for making the designs and preparing the contract documents.’ Ghana is financing the construction work by means of Chinese loans.

Ghana’s coastline is 539 km long and very inhospitable. Approximately 20 percent of the population relies on fishing or related activities. For more than a century Ghana has grappled with the question of how to build the small fishing ports. Loading and unloading currently take place on the beach and the boats and canoes cannot always cope with the heavy waves. Reeskamp: ‘ Building the ports will provide better protection for the boats and it will be possible to load and unload hygienically in the lee of a breakwater. Thanks to cold stores the caught fish will be storable for much longer and this will give Ghana’s economy a significant boost .’

Land will be reclaimed and quays and breakwaters will be built in the new port areas. Reeskamp: ‘ The client wants to build small modern ports, including a fish market, port buildings, good infrastructure and crèches .’

DHV is assisting in the selection of the contractors and is also responsible for supervising the construction work. Reeskamp: ‘ We know every detail of the designs of the ports and in addition to drawing up the contract documents we also prepared the environmental impact assessments .’

The eleven new ports will be distributed along the coast. There will be ports in Axim, Dixcove, Winneba, Senya Beraku, Elmina, James Town, Gomoa Fetteh, Moree, Mumford, Teshie and Keta.

[mappress]

Dredging Today Staff, May 30, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago