Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Anholt: Preparations in Grenaa Harbour Underway (Denmark)
News

June 7, 2012 · about 14 years ago

Anholt: Preparations in Grenaa Harbour Underway (Denmark)

The installation of the wind turbines for the Anholt Offshore Wind Farm will commence in September, but already now, the preparations in and around Grenaa Harbour are in full activity before Siemens Wind Power commences the installation works. As the installation vessels also have to jack up in Gren

1 minutes read
  • LinkedIn
  • X
  • Email

The installation of the wind turbines for the Anholt Offshore Wind Farm will commence in September, but already now, the preparations in and around Grenaa Harbour are in full activity before Siemens Wind Power commences the installation works.

As the installation vessels also have to jack up in Grenaa North Harbour when hoisting the heavy wind turbine components on board the installation vessels, the seabed conditions at the north quay have also been inspected.

The inspections proved that in certain areas of the harbour, the seabed is too soft for the installation vessels to perform safe operations; therefore, a dredging boat is removing the upper seabed layer before gravel is laid in the affected area.

Furthermore, four sheet piling boxes will be driven into the seabed and placed to fit precisely with the impression of one of the three installation vessels.

[mappress]

Dredging Today Staff, June 7, 2012; Image: dongenergy

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago