Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›China: CCCC Fourth Harbor Consultants Lands Dadeng Reclamation Project
News

June 13, 2012 · about 14 years ago

China: CCCC Fourth Harbor Consultants Lands Dadeng Reclamation Project

Recently, CCCC Fourth Harbor Consultants Co., Ltd. has won the bid for Phase 1 engineering design of the south rim of Dadeng in south Xiang’an, Fujian Province. Located in the sea area between Heshang Reef of Dadeng Island and Yangtang Cape in the southeast of Dadeng Bridge, Xiang’an District, Xiame

1 minutes read
  • LinkedIn
  • X
  • Email

Recently, CCCC Fourth Harbor Consultants Co., Ltd. has won the bid for Phase 1 engineering design of the south rim of Dadeng in south Xiang’an, Fujian Province.

Located in the sea area between Heshang Reef of Dadeng Island and Yangtang Cape in the southeast of Dadeng Bridge, Xiang’an District, Xiamen, some 2 kilometers from Xiamen island, the project will reclaim an area of 2.1 square kilometers.

With a reclamation volume of 14.653 million cubic meters and a total investment of 880 million yuan, the project involves a 3,633-meter temporary revetment, a 734-meter eastern temporary revetment and a 4,833-meter temporary drainage channel.

[mappress]

Dredging Today Staff, June 14, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago