Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Oman: Port of Sohar Hands Over Project to Wilayat of Liwa
News

June 25, 2012 · about 14 years ago

Oman: Port of Sohar Hands Over Project to Wilayat of Liwa

Under the auspices of HE Sheik Hamad bin Salim Al Aghbari, Wali of Liwa, a handover ceremony of the artificial reef project in the Wilayat of Liwa was held on Sunday the 24th of June 2012 at the Sohar Industrial Port Company SAOC offices, Sohar. Mr. Andre Toet, Group CEO of Port of Sohar handed [&he

2 minutes read
  • LinkedIn
  • X
  • Email

Under the auspices of HE Sheik Hamad bin Salim Al Aghbari, Wali of Liwa, a handover ceremony of the artificial reef project in the Wilayat of Liwa was held on Sunday the 24th of June 2012 at the Sohar Industrial Port Company SAOC offices, Sohar.

Mr. Andre Toet, Group CEO of Port of Sohar handed over the project to HE Sheik Hamad bin Salim bin Ahmad Al Agbari, Wali of Liwa. The ceremony was attended by several local dignitaries.

The project has been prepared in good coordination with the local communities, the National Hydrographic Office, the Ministry of Transport and Communication, the Ministry of Fisheries Wealth and the Ministry of Environment & Climate Affairs.

All parties involved have expressed their strong support and appreciation for this initiative.

The artificial reef is installed in the Wilayat of Liwa, opposite Harmool Village.

The installation is part of the development of the recently constructed offshore Bulk Jetty which has been built in front of the port.

A special design for the reef was made to enable the re-use of construction materials from the Bulk Jetty project. In addition, 40 large reef balls have also been installed.

The location which has been selected has optimal conditions for having an artificial reef.

The location is also very suitable for having further expansions of the reef as part of future initiatives.

The reef will thereby continue to contribute to the diversity and volume of the fishing stock in the

area. As part of the Artificial Reef project, the Port of Sohar is now aiming to establish a monitoring program with one of the educational institutes in Sohar in order to monitor the development of the reef and the marine life around it.

[mappress]

Dredging Today Staff, June 25, 2012; Image: portofsohar

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago