Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Army Corps to Host Sheyenne River Flood Risk Management Study (USA)
News

July 2, 2012 · about 14 years ago

Army Corps to Host Sheyenne River Flood Risk Management Study (USA)

The U.S. Army Corps of Engineers, St. Paul District, along with Valley City, N.D., will hold a public meeting July 10 to provide background information on and introduce the public to the Valley City Sheyenne River Flood Risk Management Feasibility study. The purpose of this study is to evaluate alte

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, along with Valley City, N.D., will hold a public meeting July 10 to provide background information on and introduce the public to the Valley City Sheyenne River Flood Risk Management Feasibility study.

The purpose of this study is to evaluate alternatives for flood risk management in Valley City.

The purpose of this meeting is to present initial information about the feasibility study and to provide a forum for public feedback. The meeting will be held July 10 at the Valley City High School, 493 Central Ave. N. The meeting will begin at 6:30 p.m. with an open house, followed by a formal presentation at 7 p.m. and a question and answer period at 7:30 p.m.

The study has been broken into three phases. The first phase of the study is currently underway and is anticipated to be complete in December of 2012.

Phase 1 tasks include initial data collection, an update to the area hydrology, analysis of the current flood damage reduction projects and the development of the initial alternatives. The array of alternatives includes no action or continuing emergency flood fight measures, non structural measures such as raising buildings or relocation, and structural measures such as levees and floodwalls.

Phase 1 analysis will determine the federal government’s role in implementing a flood risk management project in Valley City.

The next two phases of the study will be carried out in 2013 and 2014. Project alternatives will be compared and evaluated in Phase 2 and a tentatively selected plan will be established. Phase 3 will include the development of the tentatively selected plan.

[mappress]

Dredging Today Staff, July 3, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago