Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Russia: Basic Element Completes Construction of Sochi Cargo Port
News

July 3, 2012 · about 14 years ago

Russia: Basic Element Completes Construction of Sochi Cargo Port

Basic Element Group, one of Russia’s leading diversified business groups, has announced the completion of construction of the Imeretinskiycargo port in Sochi. The port’s capacity is 5 million tonnes of cargo per year. The port’s docks are up to 9.2 meters deep. Investment in the port construction am

3 minutes read
  • LinkedIn
  • X
  • Email

Basic Element Group, one of Russia’s leading diversified business groups, has announced the completion of construction of the Imeretinskiycargo port in Sochi. The port’s capacity is 5 million tonnes of cargo per year.

The port’s docks are up to 9.2 meters deep. Investment in the port construction amounted to USD 200 million (RUR 6 billion). The project was carried out by Transstroy, a part of Basic Element and Russia’s leading transport and infrastructure construction company.

The port will serve to deliver cargo and construction materials to Imeretinskaya Valley, where most construction sites for the 2014 Sochi Winter Olympic Games are located. The launch of the port will open the shortest track for the cargo delivery to the area. After the Winter Olympics, the port will be retrofitted into a yacht marina. The Imeretinskiy cargo port is the only versatile cargo port in the Sea of Azov and Black Sea basin to be built in the post-Soviet period.

In addition, it is the only port to be built through a public-private partnership (PPP) in Russia. The fact that the port has been erected on the Black Sea coast near underwater canyons, which have a complicated tidal and seismic environment, makes this construction project unique.

The construction works have been completed in accordance with the project statement. There are eight all-purpose mooring facilities to receive general and bulk cargo, the seashore infrastructure has been developed and manufacturing equipment has been set in place. In addition, within the public part of the project, the harborage has been dredged and the undulatory-proof constructions have been built. The first phase of the port – three moorages with capacity for 2 million tonnes of cargo transfer – was launched in April 2010.

The port moorages are equipped with mobile harbour cranes Liebherr (LHM-280 and LHM-180), crane-manipulators, front-end loaders and forklift cargo handlers. The moorages are able to accommodate different loads including bulk cargos (crushed stone, sand), big bags of cement and other general cargos (including freights in containers) needed to build the Olympic facilities.

The project developer is the Port Sochi Imeretinskiy. The port maintenance is provided by Imeretinskaya Stevedore Company.

Both companies are part of Basic Element.

The retrofitting of the port will begin after the end of the 2014 Sochi Olympics. It is estimated that marina capacity will reach 600-700 boats. Approximate investment into the port retrofitting is estimated at EUR 50 – 100 million, depending on the design plan which is currently under development.

Basic Element is now working on the project development together with leading European marina management operators, which will handle the marina management, its promotion, high-quality service development and technical maintenance for yachts.

The marina will be located near the Olympic Village, which is currently being built by Glavstroy (a part of Basic Element). After the Winter Olympics, this property will become part of the Sochnoe year-round resort complex.

Oleg Deripaska, CEO of Basic Element , said: “ We are glad to announce the completion of all construction works in the Imeretinskiy port, which is the first cargo port built in modern Russia. The construction of this port is one of the fundamentals for the successful preparation ofr the Olympic Games in 2014. Development of infrastructure facilities is among the key strategic priorities of Basic Element. Creation of modern and solid foundation for the development of key Russian regions is at the forefront of this strategy.”

[mappress]

Dredging Today Staff, July 4, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago