Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Dredging of Indiana Harbor and Ship Canal Set for September (USA)
News

July 4, 2012 · about 14 years ago

Dredging of Indiana Harbor and Ship Canal Set for September (USA)

According to AMM.com, the U.S. Army Corps of Engineers is slated to start dredging operations at the Indiana Harbor and Ship Canal in September. The project is eagerly welcomed by ArcelorMittal USA lnc., which has a facility on the waterway and expects to more efficiently receive material as a resul

1 minutes read
  • LinkedIn
  • X
  • Email

According to AMM.com, the U.S. Army Corps of Engineers is slated to start dredging operations at the Indiana Harbor and Ship Canal in September.

The project is eagerly welcomed by ArcelorMittal USA lnc., which has a facility on the waterway and expects to more efficiently receive material as a result of the project.

“ The dredging is critical to ArcelorMittal’s operations ,” a spokeswoman for the Chicago-based steelmaker told AMM, noting that the company had been lightening vessels for years so they could safely navigate the waterways. “ The overdue dredging will allow vessels to safely maintain normal volumes, thus reducing the number of trips a vessel must make to complete shipment.”

The harbor has not been dredged since 1972. As a result, up to 200,000 cubic yards of contaminated sediment flow to Lake Michigan each year, including 67,000 pounds of chromium and 100,000 pounds of lead, Corps studies show. Much of that contamination is the result of previous industrial activity at the steelworks.

AMM reports that the S180-million harbor project includes a confined disposal facility, built last year on the site of a former oil refinery. It will hold nearly 26 million cubic yards of sediment.

The Army Corps awarded a contract for the dredging portion of the project last September.

[mappress]

Dredging Today Staff, July 4, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago