Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USA: Pentwater Harbor Dredging Completed
News

July 20, 2012 · about 14 years ago

USA: Pentwater Harbor Dredging Completed

In less than 24 hours, a dredging crew from MCM Marine in Sault St. Marie came in and removed an estimated 4,400 yards of material from the mouth of the Pentwater Channel at Lake Michigan, reports oceanaheraldjournal.com. Pentwater Village Manager Jim Miller says water currents have caused sand and

2 minutes read
  • LinkedIn
  • X
  • Email

In less than 24 hours, a dredging crew from MCM Marine in Sault St. Marie came in and removed an estimated 4,400 yards of material from the mouth of the Pentwater Channel at Lake Michigan, reports oceanaheraldjournal.com.

Pentwater Village Manager Jim Miller says water currents have caused sand and sediment to collect at the harbor entrance where the water is only eight feet deep.

Pentwater Harbor, Michigan is located on the east shore of Lake Michigan, 146 miles northeasterly from Chicago, Illinois and 14 miles southerly from Ludington, Michigan. The project was authorized by the Rivers and Harbors Acts of 2 March 1867, 3 March 1873, 5 July 1884, 13 July 1892 and 2 March 1907. The project provides for widening the old entrance channel to 150 feet between parallel piers and revetments, the channel to extend from Lake Michigan to Pentwater Lake, with a depth of 16 feet. The piers and revetments are built of stone-filled timber cribs and piling and are provided with concrete superstructure. The north pier and revetment was completed in 1885 for a length of 2,226 feet. The south pier and revetment was completed in1889 for a length of 1,847 feet. The present length of the north pier and revetment is 2,022 feet; 204 feet of deteriorated pier was removed in 1931. In 1960, the north pier was extended 60 feet by construction of a rubblemound structure. The portion of the project authorized by the R&H Act of 13 July 1892 was deauthorized in Nov 1977. The channel is currently maintained at 12 feet deep. The harbor services primarily recreational navigation interests.

[mappress]

Dredging Today Staff, July 20, 2012; Image: Pentwater

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago