Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Coastal Association Seeks Permit to Place Dredged Sand on Plum Island (USA)
News

August 7, 2012 · about 14 years ago

Coastal Association Seeks Permit to Place Dredged Sand on Plum Island (USA)

The Coastal Property Owners Association is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with placing dredged sand to support a coastal dune on Plum Island in Newbury, Mass. The Coastal Property Owners Assoc

2 minutes read
  • LinkedIn
  • X
  • Email

The Coastal Property Owners Association is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with placing dredged sand to support a coastal dune on Plum Island in Newbury, Mass.

The Coastal Property Owners Association is proposing to perform work and discharge dredged material below the high tide line (HTL) of waters of the U.S. in order to bulldoze sand from the intertidal zone and place it in front of the coastal dune that exists just above the high tide line in the Atlantic Ocean at Plum Island Beach in Newbury.

This activity is referred to as beach scraping. The area being reviewed is directly in front of 29, 31, 35, 37 and 39 Annapolis Way in Newbury. The total area below the HTL where beach scraping is proposed is approximately 43,000 square feet. Sand would be bulldozed in layers ranging in thickness from 1 to 2 feet.

The five properties listed have been identified by the Newbury Building Commissioner as in danger of losing occupancy permits due to erosion of the coastal dune in front of their properties.

The purpose of the project is storm protection. The permit would be valid for a one-time beach scraping event only. Future beach scraping proposals will require a permit reauthorization. Plum Island Beach is a high energy barrier beach consisting of shifting sand. There are no significant environmental resources in the intertidal area of the beach. Therefore, no mitigation is proposed and none will be required.

The application for the federal permit was filed by the Coastal Property Owners Association with the Corps of Engineers in compliance with Section 404 of the Clean Water Act, which regulates the discharge or fill of material in United States waters, including wetlands; and with Section 10 of the Rivers and Harbors Act, which provides for federal regulation of any work in, or affecting navigable waters of the United States.

[mappress]

Dredging Today Staff, August 8, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago