Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›MassDOT Seeks Corps Permit for Oak Bluffs Project (USA)
News

August 14, 2012 · about 14 years ago

MassDOT Seeks Corps Permit for Oak Bluffs Project (USA)

The Massachusetts Department of Transportation – Highway Division (MassDOT) is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with a bridge replacement in Oak Bluffs and Tisbury, Mass. MassDOT is proposing to

2 minutes read
  • LinkedIn
  • X
  • Email

The Massachusetts Department of Transportation – Highway Division (MassDOT) is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with a bridge replacement in Oak Bluffs and Tisbury, Mass.

MassDOT is proposing to discharge fill material into approximately 0.37 acre of waters of the U.S., including wetlands, associated with the replacement of the bridge conveying Beach Road over Lagoon Pond in Oak Bluffs and Tisbury. The work includes the replacement of a previously existing bascule bridge with a new, seven-span bascule bridge, removal of an existing temporary bridge, installation of a multi-use walkway, installation of two navigation piles, approach work and associated fills, and dredge and fill associated with the installation of bridge piers, retaining walls, and a seawall.

As a result of the bridge replacement, the limits of the Lagoon Pond Federal Navigation Channel would change to match the new bascule pier location. (The U.S. Coast Guard is the permitting authority for the bridge structures and work. The Corps only has permitting authority over the placement of fill material in waters of the U.S. and adjacent wetlands for the bridge-related portion of this project).

The project will impact approximately 0.18 acre of Essential Fish Habitat (EFH) for various species and life stages. This habitat consists primarily of sand plus areas of salt marsh and eel grass. Loss of this habitat may adversely affect these species. However, the Corps has made a preliminary determination that the sitespecific adverse effect will not be substantial. Further consultation with the National Marine Fisheries Service regarding EFH conservation recommendations is being conducted.

[mappress]

Dredging Today Staff, August 15, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago