Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Port of Melbourne Development Makes Progress (Australia)
News

August 19, 2012 · about 14 years ago

Port of Melbourne Development Makes Progress (Australia)

Port of Melbourne Corporation’s (PoMC’s) $1.6 billion redevelopment of Webb Dock is advancing with the awarding of civil and maritime design contracts. The expansion of capacity at the Port of Melbourne, which is Australia’s largest container, automotive and general cargo port was announced by the V

2 minutes read
  • LinkedIn
  • X
  • Email

Port of Melbourne Corporation’s (PoMC’s) $1.6 billion redevelopment of Webb Dock is advancing with the awarding of civil and maritime design contracts.

The expansion of capacity at the Port of Melbourne, which is Australia’s largest container, automotive and general cargo port was announced by the Victorian Premier, Mr Ted Baillieu and the Minister for Ports, Dr Denis Napthine in April this year.

PoMC Chief Executive Officer, Stephen Bradford , today announced the appointment of two consultants who will be responsible for the delivery of detailed designs for the project’s internal roads, services infrastructure, interface buffers and maritime engineering services.

“This is an important first step in the redevelopment of Webb Dock which is the site for Melbourne’s third international container terminal and a new world class automotive facility” , Mr Bradford said.

PoMC’s Expression of Interest and tender processes attracted an enormous amount of interest. Mr Bradford stated that the submissions received displayed a high level of technical expertise and demonstrated a strong competitive focus.

The evaluation processes determined that the contract for civil engineering design services be awarded to Aurecon Australia Pty Limited. The scope of the civil works includes detail design of internal roads, interface buffers site preparation works and services infrastructure.

PoMC also advised the appointment of Arup Pty Limited to provide maritime engineering consulting services for the project’s extensive maritime works. The maritime program includes re-engineering the existing wharves at Webb Dock East, dredging and the design of a new 920 metre wharf for the port’s automotive trade which will be consolidated into a new world class facility at Webb Dock West.

“Aurecon & Arup both have an excellent track record for designing and delivering large scale infrastructure with a focus on innovation and sustainability – their worldwide experience will help to create the innovative design outcomes we are seeking for Webb Dock” Mr Bradford said.

[mappress]

Dredging Today Staff, August 20, 2012; Image: Port of Melbourne

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago