Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Army Corps Issues Public Notice for Panama City Beach Renourishment (USA)
News

August 24, 2012 · about 14 years ago

Army Corps Issues Public Notice for Panama City Beach Renourishment (USA)

The U.S. Army Corps of Engineers (USACE), Jacksonville District has issued a public notice in relation to an application for a Department of the Army permit, submitted by Bay County Tourist Development Council, Panama City Beach, Fla. Bay County Tourist Development Council proposes to stabilize and

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers (USACE), Jacksonville District has issued a public notice in relation to an application for a Department of the Army permit, submitted by Bay County Tourist Development Council, Panama City Beach, Fla.

Bay County Tourist Development Council proposes to stabilize and renourish approximately 17.5 miles of beach between Phillips Inlet and St. Andrews State Park, impacting up to 315 of Waters of the United States waterward of the Mean High Water Line. Under Section 404 of the Clean Water Act, USACE regulates dredge and fill activities in waters of the United States, including wetlands. Under Section 10 of the Rivers and Harbors Act of 1899, USACE is responsible for protecting and maintaining the nation’s navigable waterways.

The proposed project would be accomplished in three phases. Phase I consists of routine nourishment at 9-10 year intervals, with timing determined by monitoring of conditions. Phase II is for emergency nourishment in response to major storm erosion, which will be a combination of storm loss replacement and routine nourishment. Phase III is for smaller hot spot nourishment within the Panama City Beach project area, when the need arises during the permit period. If a major storm impacts the project area, dune and vegetation losses may be replaced to the greatest extent practical, subject to upland owner permission.

To minimize turbidity, the borrow areas from which sand will be taken have a silt component below the state limit of five percent. A water-sediment slurry will be pumped by hydraulic dredge from the borrow areas to the beach, where it will be contained by a system of dikes until it settles. Turbidity monitoring will also be conducted.

The applicant states that positive impacts to the coastal ecosystem will occur as a result of the project, including storm erosion protection, increasing sea turtle and shorebird nesting areas, and a more aesthetically pleasing recreational beach.

In accordance with the provisions of the Magnuson-Stevens Fishery Conservation and Management Act, USACE has initiated consultation with the National Oceanic and Atmospheric Administration’s Fisheries Service on minor adverse impacts to Essential Fish Habitat or federally managed fisheries in the Gulf of Mexico. USACE has also determined that the proposed project may affect several federally listed species, including sea turtles, piping plover, Choctawhatchee beach mouse, and Gulf sturgeon and its designated critical habitat. Furthermore, USACE has determined the project may affect, but is not likely to adversely affect manatees, St. Andrew beach mouse and smalltooth sawfish. There are no known historic properties within the project area.

[mappress]

Press Release, August 24, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago