Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Deltares: Successful Final Dike Test at IJkdijk (The Netherlands)
Business & Finance

September 12, 2012 · about 14 years ago

Deltares: Successful Final Dike Test at IJkdijk (The Netherlands)

A preliminary analysis of the results has shown that the sensor systems predict the dike breaches well in advance. The dikes collapsed at the IJkdijk test location in Bad Nieuweschans, the Netherlands, on Saturday, 8 September. The exact failure mechanism still has to be determined. The first two di

2 minutes read
  • LinkedIn
  • X
  • Email

A preliminary analysis of the results has shown that the sensor systems predict the dike breaches well in advance.

The dikes collapsed at the IJkdijk test location in Bad Nieuweschans, the Netherlands, on Saturday, 8 September. The exact failure mechanism still has to be determined. The first two dikes collapsed on 26 and 27 August. During the next few months, Deltares, together with an independent committee, will assess how the advanced measurement systems have performed.

Commissioned by the IJkdijk foundation, Deltares has played an important coordinating role within these experiments. Haike van Lottum, project leader , is very pleased with the developments:

“We can be very proud of this IJkdijk-experiment. At Deltares, we have made it possible again, that dikes collapsed in a controlled way. If it turns out that the sensors are able to predict the collapse, it will reduce the future need for expensive solutions such as raising dikes.”

Stichting IJkdijk had already carried out various previous experiments in which the dike collapsed because of a single, specific failure mechanism. In the All-In-One experiment, various mechanisms occurred simultaneously. It was not known in advance how, when and where a dike would collapse.

Various companies contributed to predicting the dike breach and making this visible in dashboards on screens. A large number of sensors and measurement devices were installed to do this in and around the test dikes. This Dutch experiment has already attracted worldwide attention.

[mappress]

Press Release, September 12, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago